Buying your next home before the sale of your current property is complete can make…
New Construction Financing: A Move-Up Buyer Guide

Building a new home can create the space and features you want, but coordinating construction financing with the sale of your current property can feel complicated.
New construction financing provides funds in scheduled draws as a home is built, with the loan commonly converting to or being replaced by permanent mortgage financing after completion.
In this guide, we’ll explain the process step by step, including loan structures, equity planning, documentation and important decisions for move-up buyers.
Key Takeaways
- Purpose: New construction financing helps pay for land, labor, materials and other eligible costs during a home build.
- Structure: Borrowers may use a construction-to-permanent loan or separate construction and permanent loans.
- Qualifications: Lenders commonly review credit, income, assets, reserves, project plans, builder qualifications and the completed value of the property.
- Timeline: The process follows the construction schedule, with funds released after documented milestones and inspections.
- Best For: This approach may fit buyers moving from a current home into a newly built primary residence.
At Haus Capital Corporation (NMLS# 1549644), we help borrowers evaluate construction, jumbo, conventional and bridge financing based on the property, project and broader financial plan. Our focus is personalized guidance, clear communication and a financing strategy aligned with the transaction.
Quick Answers About New Construction Financing
- Can equity from a current home help fund a new build? Yes. Depending on the available equity and loan structure, proceeds from a sale or separate equity financing may help cover land, construction or required cash at closing.
- Do borrowers make payments during construction? Often, payments during the construction phase are based on funds that have already been disbursed. The exact method varies by loan program.
- Can construction begin before the current home is sold? It may be possible when income, assets, equity and debt obligations support the plan. Some borrowers also evaluate bridge financing.
- Is one closing or two closings better? Neither structure is right for every project. One-closing financing can simplify the transition, while two-closing financing may provide more flexibility when selecting permanent terms.
How New Construction Financing Works
A construction loan does not typically release the full loan amount at the beginning of the project. Instead, funds are advanced through a draw schedule tied to specific stages of construction.
A typical draw schedule may include land acquisition, site preparation, foundation work, framing, mechanical systems, interior finishes and final completion. Before each draw, the lender may require an inspection to confirm that the work has been completed as planned.
The builder then receives eligible funds based on the approved budget and documented progress. This structure helps keep the financing aligned with the work completed on the property.
Construction programs and draw procedures vary by lender. As of 2026, borrowers should verify current documentation, reserve, appraisal and builder requirements before entering into a construction agreement.
Construction-to-Permanent vs. Two-Closing Financing
Move-up buyers generally encounter two primary financing structures. Understanding the difference can help with budgeting, rate planning and the transition from the current home.
| Feature | Construction-to-Permanent | Two-Closing Structure |
|---|---|---|
| Closings | One closing generally covers construction and permanent financing. | The construction loan and permanent mortgage close separately. |
| Permanent Loan | Commonly converts after the home is completed and required conditions are satisfied. | Requires a new mortgage transaction when construction is complete. |
| Documentation | Qualification is generally completed before construction begins, with ongoing project documentation. | Borrower qualifications and property information are reviewed again for permanent financing. |
| Planning Consideration | Can create a more streamlined transition from construction to the permanent mortgage. | May allow the borrower to compare permanent financing options closer to completion. |
Our construction home loan options can vary based on property type, occupancy, loan amount and borrower qualifications. Rates, fees and requirements also change, so current information should be confirmed for each project.
Step 1: Build a Financing Plan Before Choosing the Project
New construction planning should begin with the complete financial picture. This includes the expected cost of the new home, the value and mortgage balance of the current property, available liquid assets and ongoing monthly obligations.
For move-up buyers, the timing of the current home sale is often central to the strategy. Selling first may make equity available earlier, but it can also create a need for temporary housing. Building first may offer a more direct move, but the borrower may need to qualify while carrying obligations on both properties.
The right structure depends on income, liquidity, reserves and the expected construction schedule. Reviewing these details early can help identify potential timing issues before contracts are signed.
Step 2: Decide How Current-Home Equity Will Be Used
Equity can play several roles in a new construction transaction. It may support the land purchase, required borrower contribution, construction costs or cash reserves.
If the current home will not be sold before construction begins, borrowers may consider whether separate equity or bridge home loan financing fits the overall plan. Bridge loans are short-term financing arrangements that may help connect the purchase or construction of a new property with the future sale of another property.
Bridge financing creates an additional debt obligation and should be evaluated alongside the expected sale timeline, monthly cash flow and available reserves. Property equity alone does not determine qualification.
Step 3: Select the Builder, Plans and Construction Budget
The lender reviews more than the borrower. The builder and project must also meet program requirements.
Commonly requested project information includes:
- A signed construction contract
- Detailed plans and specifications
- A line-item construction budget
- A proposed draw schedule
- The anticipated construction timeline
- Builder licensing, insurance and experience documentation, as applicable
- Land ownership or purchase contract information
The construction contract should clearly identify what is included in the price. Allowances, upgrades, landscaping, appliances and site work can materially affect the final budget.
Changes after construction begins may require lender review. Building a realistic contingency into the broader financial plan can help address eligible cost changes without disrupting the project.
Step 4: Complete Borrower and Project Underwriting
Construction financing combines borrower underwriting with a detailed review of the proposed home. Lenders commonly evaluate credit history, qualifying income, employment or business documentation, assets, existing debts and post-closing reserves.
Documentation may include:
- Income and employment records
- Personal or business tax documents when required
- Bank, investment and retirement account statements
- Current mortgage and property information
- Purchase, land and construction contracts
- Plans, specifications and builder documents
- Information explaining the source of funds used in the transaction
Self-employed borrowers, real estate investors and borrowers with complex income may need additional documentation. Non-QM or alternative documentation programs may be considered when they align with the borrower’s circumstances and the property.
Step 5: Obtain an Appraisal Based on the Completed Home
A new construction appraisal generally estimates the property’s value as if the home were complete according to the submitted plans and specifications. The appraiser reviews the proposed improvements, site and relevant market data.
The completed value is important because the loan is not based only on the builder’s contract price. If the appraised value does not support the requested structure, the borrower may need to revise the project, adjust the financing or contribute additional funds.
In Rochester, Buffalo, the Finger Lakes and other New York markets, land values and comparable new construction can vary significantly by location. A detailed and accurate project package helps the appraiser understand the proposed property.
Step 6: Close the Loan and Begin the Draw Process
After underwriting requirements are satisfied and the loan closes, construction funds are generally placed under controlled disbursement. The builder requests draws as work reaches approved milestones.
A typical draw process includes:
- The builder completes an approved stage of work.
- A draw request and supporting documents are submitted.
- An inspection confirms the documented progress.
- The lender reviews the request and releases eligible funds.
- The remaining budget is updated before the next phase begins.
Draw timing should be discussed with the builder before construction starts. The builder needs to understand the lender’s inspection and disbursement procedures, including any documentation required for materials, subcontractors or completed work.
Step 7: Prepare for Completion and Permanent Financing
As construction approaches completion, the lender may require a final inspection, updated title information, proof of insurance and documentation that the home is ready for occupancy. Requirements depend on the program and local process.
With a construction-to-permanent loan, the financing generally transitions to the permanent mortgage after required completion conditions are met. With a two-closing structure, the borrower completes a separate permanent mortgage transaction.
Higher-value projects may require jumbo home loan financing when the final loan amount is above current conforming loan limits. Those limits vary by county, and jumbo programs often have distinct credit, reserve and documentation standards.
Common Planning Issues for Move-Up Buyers
Carrying Two Properties
If the current home remains unsold, its mortgage, taxes, insurance and other obligations may be included in qualification. A projected sale does not automatically remove those obligations from the lender’s analysis.
Construction Delays
Weather, permits, materials and change orders can affect the schedule. Borrowers should understand how the loan handles extensions and whether additional review or costs may apply.
Budget Changes
Upgrades and design changes can increase the project cost. The lender may not finance every change, particularly if it is outside the approved contract or unsupported by the completed value.
Cash Reserves
Construction programs often place significant attention on liquidity after closing. Required reserves vary based on the loan amount, property obligations, program and borrower profile.
Review Your New Construction Strategy
New construction financing involves the borrower, builder, appraiser, lender and settlement professionals. A well-organized plan can bring these parts together and help move the transaction forward efficiently.
We work with buyers in Greater Rochester, Western New York, Saratoga Springs and communities throughout the states where we conduct mortgage business. If you are considering a custom home or builder project, call, text or email us to review your scenario, compare structures and explore your options before making a final commitment.
Frequently Asked Questions
Can a jumbo loan be used for a new construction home?
Yes, some construction programs support loan amounts above conforming limits. Jumbo construction financing commonly includes additional credit, asset, reserve and documentation requirements, which vary by lender and scenario.
What builder documents are commonly required?
Lenders may request builder licensing, insurance, references, financial information and a record of completed projects, depending on the program. The construction contract, budget, plans, specifications and draw schedule are also commonly reviewed.
How are construction change orders handled?
Material changes generally need to be documented and may require review by the lender, appraiser or construction administrator. The borrower may need additional funds if a change is not covered by the approved budget or supported by the property’s value.
What happens if the completed appraisal is lower than expected?
A lower appraised value may reduce the financing available for the project. Options may include revising the plans, changing the loan structure or contributing additional funds, subject to current underwriting requirements.
Can construction financing be used for an investment property?
Some programs permit construction financing for non-owner-occupied properties, but the structure differs from primary residence financing. Qualification may place greater emphasis on liquidity, project experience, property cash flow and the proposed exit strategy.
